First Orion Crew Module Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 11, 2014

First Orion Crew Module Completed

Scheduled For Launch Into Space In December

NASA’s first completed Orion crew module is sitting atop its service module at the Neil Armstrong Operations and Checkout Facility at Kennedy Space Center in Florida after being completed over the weekend.

The crew and service module are scheduled to be transferred together on Thursday to the Payload Hazardous Servicing Facility, where the Orion spacecraft will be fueled with ammonia and hyper-propellants for its flight test. It later will be moved again for the installation of its launch abort system. At that point, the spacecraft will be complete and ready to stack on top of the Delta IV Heavy rocket that will carry it into space on its first flight in December.

Orion is undergoing preparations for its maiden flight in December atop a United Launch Alliance Delta IV Heavy rocket, an uncrewed test that will take it 3,600 miles above Earth on a 4.5-hour mission to test the systems critical for future human missions to deep space. After two orbits, Orion will re-enter Earth’s atmosphere at almost 20,000 miles per hour before its parachute system deploys to slow the spacecraft for a splashdown in the Pacific Ocean.

The spacecraft will eventually carry humans into space aboard NASA's SLS rocket, described by the agency as the most powerful rocket ever built. The first unmanned launch of an Orion crew module aboard SLS has been pushed back until November, 2018.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC