AD: Airbus Helicopters Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 15, 2019

AD: Airbus Helicopters Deutschland GmbH Helicopters

AD NUMBER: 2019-05-05

PRODUCT: Eurocopter Deutschland GmbH Model MBB-BK 117 A-1, MBB-BK 117 A-3, MBB-BK 117 A-4, MBB-BK 117 B-1, MBB-BK 117 B-2, and MBB-BK 117 C-1 helicopters.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 97-26-03 for the aircraft listed above. AD 97-26-03 required visual inspections for cracks in the ribbed area of the main rotor (M/R) mast flange (flange).

Since issuing AD 97-26- 03, the FAA has determined that a certain reinforced M/R mast is not affected by the unsafe condition. This new AD retains the requirements of AD 97-26-03 and removes a certain M/R mast from the applicability.

DATES: This AD is effective April 17, 2019.

COST: The FAA estimates that this AD affects 62 helicopters of U.S. Registry. Operators may incur the following costs in order to comply with this AD:

Labor costs are estimated at $85 per work-hour.

Visually inspecting the flange for a crack requires 0.25 work-hour for an estimated cost of about $21 per helicopter and $1,302 for the U.S. fleet per inspection cycle. Replacing the M/R mast requires 10 work-hours and parts cost $50,000 for an estimated cost of $50,850 per helicopter.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC