Lockheed Martin Says F-35 Flight Test Program Made Progress In First Quarter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 06, 2011

Lockheed Martin Says F-35 Flight Test Program Made Progress In First Quarter

Nearly 200 Test Flights Completed Despite Mandatory Groundings

Statistics released Monday by Lockheed Martin F-35 Lightning II show that test jets made considerable flight test progress during the first quarter of 2011, conducting 199 test flights versus a plan of 142 flights. The company said the test program remained ahead of plan despite the grounding of various test fleet aircraft for 4-15 days during the period as officials investigated the cause of a dual generator/starter failure during a flight on March 9.

Among the highlights in the report released Monday:

  • Conventional takeoff and landing (CTOL: F-35A) aircraft conducted 82 flights against the plan of 62.
  • STOVL (F-35B) aircraft conducted 101 flights against a plan of 62, and logged six times more vertical landings in the first quarter than in all of 2010.
  • Carrier variant aircraft accomplished 16 flights of 18 planned.
  • Two production-model aircraft, AF-6 and AF-7, flew for the first time in preparation for delivery to the U.S. Air Force this year. AF-6 and AF-7 flew seven times in the first quarter.
  • STOVL variant BF-1 performed the first touch-and-go maneuver in VL mode this quarter.
  • From the start of flight testing in December 2006 through March 31, 2011, F-35s have flown 753 times, including production-model flights.
FMI: www.lockheedmartin.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC