MOSAIC Delay Upsets SportPlane Industry | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 09, 2022

MOSAIC Delay Upsets SportPlane Industry

Delay Could Put Off Much Needed Reg Update For Well Over A Year...

The Annual Oshkosh “Meet the Boss” event was one of the most sparsely attended editions we’ve seen to date… seemingly due to the fact that word was out that the FAA had disappointing news…

And, darn it, they did. 

What everyone wanted to hear, was positive news about MOSAIC… a program that would determine the future of light aircraft. A working version, if not the NPRM itself, was previously promised for this year but due to the extended politics of separating the program into segments that set unmanned aircraft and autonomous vehicles apart from the pseudo-LSA sport aircraft community, it needed revision. 

A great number of LSA and GA manufacturers were hoping for positive news since the delay was keeping them from finalizing the next generation of Sport and GA aircraft, and having new aircraft ready to sell ASAP…

But; that isn’t happening with delays forecast to take another year, at least… which one active LSA manufacturer called, ‘devastating.’

A broadened definition of what constitutes a sport aircraft and a means to reasonable certification were one of the most important factors several manufacturers noted in hopes for the AirVenture 2022…

One manufacturer stated that. ‘This industry needed the FAA to do their job and help us rebuild aviation, and they’ve really let us down… for a year or more--or even longer. It’s going to be costly…”

FMI: www.faa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC