Major Fatigue Testing Of Airbus Military A400M Underway In Dresden | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 20, 2011

Major Fatigue Testing Of Airbus Military A400M Underway In Dresden

Aircraft Will Be Stressed To Imitate 160 Flights Per Day

Major fatigue testing of the Airbus Military A400M has begun on schedule in Dresden in January. The test airframe, known as MSN5001, will be subjected to a punishing regime of loads, 24 hours per day, for an initial four weeks, eventually simulating 160 flights per day.


A400M Fatigue Testing

The first 1,665 simulated flights are required for European Aviation Safety Agency (EASA) type certification of the A400M, but over the next 18 months a total of 25,000 simulated flights will be performed - equating to 2.5 times the A400M's design-life. Static testing of another A400M test airframe, MSN5000 was completed in Madrid in September 2010. That airframe continues to be used for further fatigue tests of composite structures which will last until early 2012.


File Photo

Four of the A400Ms are in the current test flight program. The fourth Airbus Military A400M military airlifter has made its first flight late in December, and the four airplanes completed just over 1,000 hours flight-time and 300 flights last year. Airbus says flight and ground load testing are complete, as is measurement of cruise performance. All major aircraft systems have been tested and flutter tests throughout the flight envelope are extremely close to completion. The Europrop International (EPI) TP400 engines have been performing well, with the in-flight relight capability having been successfully demonstrated and ground starts following an overnight cold-soak recently performed. Behavior of the auxiliary power unit has been excellent, and it has been started as high as 40,000ft.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC