NASA Prepares To Move Endeavour To VAB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jun 29, 2007

NASA Prepares To Move Endeavour To VAB

Rollover Planned July 2; Launch In August

In preparation for the STS-118 mission to the International Space Station, NASA is scheduled to rollover space shuttle Endeavour from its hanger, the Orbiter Processing Facility, to the Kennedy Space Center's Vehicle Assembly Building on Monday, July 2.

In the Vehicle Assembly Building, crews will mate Endeavour to its external fuel tank and twin solid rocket boosters.

The next milestone for Endeavour is the 3.4-mile rollout to Launch Pad 39A, planned for July 11. Endeavour is targeted for launch in early August -- in fact, on Thursday NASA moved up the target launch date by two days, to August 7, in order to better position the Atlantis launch in between scheduled launches of two unmanned spacecraft from the Cape.

During the 11-day mission to the station, Endeavour's crew of seven astronauts will add the Starboard 5 (S5) segment to the right side of the station's backbone, or truss, as well as deliver 5,000 pounds of supplies and conduct repairs.

The mission will be Endeavour's first flight since the loss of Columbia in February 2003. NASA reports the shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis.

Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.

FMI: www.nasa.gov/mission_pages/shuttle/main/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC