Transport Canada Updates Status On 737 MAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Aug 30, 2020

Transport Canada Updates Status On 737 MAX

Flight Test Evaluations Took Place On August 26 And 27 In US Airspace

Transport Canada reports that it has "successfully completed a series of flight test activities of the updated aircraft as part of the validation process.

From August 23 to 25, 2020, Transport Canada’s flight test crew were flown to Seattle, Washington, to conduct evaluations on the engineering simulator at the Boeing facility and then at the end of the each test day, were flown back to Vancouver."

The flight test evaluations took place on August 26 and 27 in U.S. airspace using the Boeing test aircraft.

Transport Canada adds that, “The Government of Canada remains committed to keeping Canadians, the travelling public, and the transportation system safe and secure... Transport Canada continues to work extensively with the United States Federal Aviation Administration (FAA) and civil aviation authorities in Europe and Brazil throughout the validation process of the Boeing 737 Max 8 aircraft."

The back and forth travel had an underlying strategy -- Mitigation measures due to the COVID-19 pandemic had been established for the validation activities, including the flight tests, to ensure the health and safety of Transport Canada employees.

Canada is reportedly the first international regulator to complete validation testing activities of the aircraft. Transport Canada is now analyzing the results of these tests and will determine, through its own independent review, whether to validate the proposed changes.

Marc Garneau, the Minister of Transport, reiterates that, “Transport Canada will not lift the flight restrictions on the Boeing 737 MAX 8 until the department is fully satisfied that all safety concerns have been addressed by the manufacturer and the FAA, and that enhanced flight crew procedures and training are in place.”

In the next few weeks, Transport Canada will participate in a Joint Operational Evaluation Board, which is made up of representatives from global certification authorities. The results of the Board will be used to establish the minimum training requirements for the return to service of the 737 MAX 8 aircraft.

FMI: https://tc.canada.ca

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC