FAA Administrator Huerta Dedicates New Taos Runway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 29, 2017

FAA Administrator Huerta Dedicates New Taos Runway

Federal Grants Totaling About $25 Million Paid For Most Of The Project

Culminating a two-decade-long effort, FAA Administrator Michael P. Huerta on Friday joined local and state officials in dedicating the new, 8,600-foot runway at Taos Regional Airport.

The new runway is perpendicular to the original runway. It will enable pilots to operate more safely at times of year when wind directions make the airfield more challenging.

The project also comes with important provisions aimed at protecting the lands and lifestyle of the Taos Pueblo.

“An airport is a treasure. It is the lifeblood of a community, an asset that must be nurtured,” Huerta said. “The result of our collaborative efforts is a project that will improve both the safety and utility of this important regional transportation link, while respecting the traditional values and unique culture of the Taos Pueblo.”

Federal grants totaling about $25 million paid for most of the project cost.

The environmental review for the project included extensive government-to-government consultation with the Taos Pueblo, Town of Taos and numerous state and federal agencies.

This resulted in a number of mitigations, including the installation and operation of a passive noise monitoring system. The system, which began operating in 2014, will support a pre-project and post-project comparison of flights over the Taos World Heritage Site and adjacent lands.

Additionally, the FAA raised the voluntary minimum flight altitude above the World Heritage site from 2,000 feet to 5,000 feet.

“We got this project right because all of the stakeholders approached this in a spirit of collaborative partnership,” Huerta said. “Without tenacity, dedication and determination we would not be standing here today.”

(Image provided with FAA news release)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC