Boeing 787 Charleston Facility Taking Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Apr 07, 2010

Boeing 787 Charleston Facility Taking Shape

First Steel Column Marks Visible Progress On Final Assembly And Delivery Complex

Boeing took another visible step toward full 787 Dreamliner production Monday by placing the first steel column for its Charleston 787 Final Assembly and Delivery facility.

"This new facility will expand our production capability and strengthen the 787 program as we work toward rate," said Marco Cavazzoni, vice president and general manager of 787 Final Assembly and Delivery, Charleston, Boeing Commercial Airplanes. "And that reflects our commitment to our customers, our team and our South Carolina community."

Boeing Charleston currently fabricates, assembles and installs systems for 787 aft fuselage sections and joins and integrates midbody fuselage sections from other structural partners. With the new, 1.2-million-square-foot building, Boeing will perform final assembly and deliver 787s from North Charleston to customers around the world. Construction on the new facility is on schedule, with production due to begin in July 2011. Boeing will deliver the first 787 built in Charleston in first-quarter 2012. To date, 90 percent of the Boeing direct-contracted dollars for the project have been with South-Carolina-based companies.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC