Gulfstream G280 Arrives In Dallas For Completions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Aug 12, 2011

Gulfstream G280 Arrives In Dallas For Completions

Human Factors Testing Complete; Function And Reliability Testing Well Under Way

The first production Gulfstream G280 recently arrived at the Gulfstream Mid-Cabin Completions Center of Excellence in Dallas, where it is being outfitted and painted for delivery later this year. Israel Aerospace Industries (IAI) experimental test pilots flew the super midsized aircraft, Serial Number 2004, from IAI in Tel Aviv, where the airframe is manufactured, to the Gulfstream facility in Dallas, where Gulfstream mid-cabin aircraft undergo final phase manufacturing.

“This is a significant transition in the G280 program, as we near the completion of flight test and launch final phase manufacturing,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “In anticipation of the G280’s arrival in Dallas, we built and fit-tested the cabin components, such as the upper and lower galley, divan, vanity and end cabinets, in our test rig, the Iron Bird. At the same time, we’re testing the final phase systems in the integration test facility. All of this will help ensure a smoother entry into service for the aircraft later this year.”

The G280 flight-test program continues as well. The three aircraft in the program have accumulated more than 1,500 hours over more than 550 flights, bringing the aircraft several steps closer to its anticipated 2011 certification by the Civil Aviation Authority of Israel (CAAI), the European Aviation Safety Agency (EASA) and the Federal Aviation Administration (FAA).

The aircraft have completed the second phase of human factors testing with representatives from CAAI, EASA and the FAA.

Additionally, function and reliability testing is well under way at IAI. This testing simulates typical, in-service flight operations, such as takeoffs, landings, instrument landing system approaches and hot/cold/humid air operations, to ensure the aircraft, its components and its equipment are reliable and function properly.

The fatigue test article, Serial Number 1999, is used to validate the aircraft’s structural durability.  The testing is designed to simulate each phase of flight: taxi, takeoff, cruise, descent and landing. Aircraft 1999, a complete aircraft without systems or interior, has undergone more than 5,000 of the 40,000 cycles required to assess the airframe’s durability over 2.5 lifetimes.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC