Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Feb 16, 2010

Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process

CJ4 Program Manager, Norm Baker, Provides an Exclusive Factory Tour

At Cessna Aircraft, “safety begins with a durable airframe.” Each airframe is stress-tested five times the aircraft’s standard lifetime; yet, Cessna’s renowned safety and reliability begins on the production line.

State-of-the-art technology allows employees to create replicable, seamless assembly for each new aircraft on the line. In the first of his four-part series, Baker describes the CJ4’s fuselage build process.

The Citation CJ4 will debut two new dual-channel, FADEC controlled Williams International FJ44-4A engines. The turbofan engines each produce 3,400 pounds of takeoff thrust, allowing the aircraft to takeoff at max weight with as little as 3,300 feet of runway.

After takeoff, the Citation CJ4 is capable of a direct climb to 45,000 feet in just 28 minutes. In addition, the CJ4 will offer increased performance over earlier projections with a maximum cruise speed of more than 450 knots and a maximum range of over 2,000 nautical miles.

On February 2nd, 2010, Cessna announced the completion of all certification testing. Three Citation CJ4 test aircraft completed over 1,100 flights with more than 2,000 flight hours accumulated. With the CJ4 in the final stages of F.A.A. type certification approvals, the company expects deliveries to begin in late 2010.

FMI: www.cessna.com/index.html, www.cessna.com/citation/citation-cj4.html, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC