Army Grounds Chinook, Honeywell Solves the Case | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 01, 2022

Army Grounds Chinook, Honeywell Solves the Case

Uh-Oh... Turns Out it IS Important to Use Factory-Approved O-Rings!

The Army issued a surprising grounding order earlier this week, halting flight operations for more than 400 Chinook helicopters over an issue that could lead to engine fires. 

In a statement, Cynthia Smith said the Army encountered an unspecified number of fuel leaks that lead to engine fires, leading to the fleet being held on pause until the issue could be diagnosed. No injuries were reported, and some reports placed the number of problem aircraft around 70 helicopters in total.

Honeywell, probably eager to correct the record and clear itself of any fault after 60 years of Chinook support, was able to track down the source of the problems soon after the order was given. The manufacturer, sure that the problem was out of the norm for the longstanding and generally reliable T-55 engine, began a joint investigation with the US Army to get to the bottom of things. 

The result? That some engines had been overhauled and refurbished with O-rings outside of Honeywell specification...while under maintenance by Army Depot personnel. The suspect O-rings have been identified and isolated to minimize the possibility of installation, with all relatively pleased that they could restore the T-55's good name.

Honeywell embarked on an effort alongside the Army to address the issue and provide suitable replacement O-rings on all affected Chinooks. The issue does highlight the susceptibility of supply chains in recent years, as a never ending parade of delays, mistakes, backorders, and substitutions continue to take their toll on a weary industry trying to keep the aircraft taking off on time. Honeywell was careful to note that the O-rings aren't theirs, coming from the mysterious ether of cheap, shoddy products offering their siren call to quartermasters everywhere.

Sadly for the spendthrift team, this round goes in favor of those who insist on using "Honeywell Approved O-Rings". 

FMI: www.honeywell.com, www.army.mil 

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC