Minnesota TFR: TFN | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Fri, Apr 16, 2004

Minnesota TFR: TFN

NOTAM:  4/3230 
Issued:  04/15/2004 18:22 
Effective:  Immediately - Until Further Notice 
State:  MN 
Facility:  ZMP - MINNEAPOLIS (ARTCC),MN. 
Type:  HAZARDS 
Description:  APPLETON,MN. 
 
FDC 4/3230
ZMP MN.. FLIGHT RESTRICTION, APPLETON,MN. EFFECTIVE IMMEDIATELY UNTIL FURTHER NOTICE. PURSUANT TO 14 CFR SECTION 91.137(A)(2) TEMPORARY FLIGHT RESTRICTIONS ARE IN EFFECT WITHIN A 10 NAUTICAL MILE RADIUS OF 451430N/0961130W AND THE MORRIS (MOX) VOR/DME 201 DEGREE RADIAL AT 022 NAUTICAL MILES AT AND BELOW 3500 FEET MSL TO PROVIDE A SAFE ENVIRONMENT FOR FIREFIGHTING AIRCRAFT OPERATIONS. THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES, PHONE 218-244-2674, IS IN CHARGE ON SCENE EMERGENCY RESPONSE ACTIVITIES. PRINCETON (PNM) AFSS, PHONE 763-389-2990, IS THE FAA COORDINATION FACILITY.

FMI: http://tfr.faa.gov/tfr/jsp/list.jsp

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC