SNC Completes Initial On-Orbit Checkout Of Eleven Satellites Built For Orbcomm | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Dec 24, 2015

SNC Completes Initial On-Orbit Checkout Of Eleven Satellites Built For Orbcomm

Spacecraft Have 'Met Or Exceeded' Performance Criteria, Company Says

Sierra Nevada Corporation (SNC) has successfully completed the solar array deployment and initial on-orbit checkout phase as planned for all 11 satellites launched for Orbcomm’s Generation 2 (OG2) Mission 2. The communication satellites were launched on December 21, 2015 from Cape Canaveral Air Force Station, Florida, on a dedicated SpaceX Falcon 9 rocket.  The launch utilized an innovative configuration of three stacked EELV Secondary Payload Adapter (ESPA) Grande rings to carry the eleven satellites to orbit.

“The initial results of the on-orbit performance of the spacecraft have met or exceeded our performance criteria,” said Mark N. Sirangelo, corporate vice president of SNC’s Space Systems. “I would like to thank all the members of our spacecraft systems team as well as our payload subcontractor, Boeing, for delivering this next-generation satellite system.   We also want to express our appreciation to Orbcomm for this opportunity to provide these 17 satellites over the past year and two launches, allowing them to offer their subscribers a more enhanced and efficient network capacity. We are proud to have led such an extraordinary team for the OG2 program and to enable this next generation constellation mission.”

SNC is the prime contractor and spacecraft bus manufacturer for OG2, completing all design, manufacturing and integration at SNC’s facility in Louisville, Colorado. The first six OG2 mission satellites were launched on July 14, 2014. Once the final 11 satellites are phased into their final orbital positions, the constellation will be complete.

Similar to management of the 2014 launch, SNC will provide Orbcomm on-orbit servicing and operations support from SNC’s Satellite Operations Center in Louisville, Colorado, in addition to on-site support at the Orbcomm Network Control Center in Sterling, Virginia.

“We'd like to thank SNC for their hard work and dedication to making this mission a success,” said Marc Eisenberg, Orbcomm’s chief executive officer. “We are pleased with the initial operation of the spacecraft and look forward to integrating the recently-launched satellites into the constellation. This launch solidifies the exponential growth of Orbcomm’s network capacity.”

All OG2 spacecraft are based on SNC’s flight-proven SN-100 satellite bus, which can be tailored to support a variety of applications, including communication, Earth observation, weather and space science. The SN-100 is designed for a five-year-minimum life and utilizes a modular payload deck that can be rapidly integrated and tested using highly automated scripts to test all functions. This allows the baseline satellite to be quickly and cost-effectively configured to meet the needs of many customers.

(Image provided with SNC news release)

FMI: www.sncorp.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC