Jury Faults GE Engine In 2008 NoCal Helicopter Accident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Mar 29, 2012

Jury Faults GE Engine In 2008 NoCal Helicopter Accident

Plaintiffs Argued Successfully That GE Knew The Engine Design Was Flawed

A jury in Portland, OR, ruled Tuesday that a GE engine was to blame for an accident in which nine firefighters were fatally injured. The crew was being airlifted away from the Iron 44 wildfire in Shasta-Trinity National Forest near Weaverville, CA, in a Sikorsky S-61N helicopter when it went down.

Attorneys for GE said that the helicopter, which was carrying 13 people at the time of the accident, was overloaded by some 1,400 pounds. They said the pilots on board had recieved inaccurate wieght and balance information from Carson Helicopters of Grant Pass, OR, the aircraft's owner. One of the pilots survived the accident and was a party to the suit.

But the attorney's for the plaintiffs said that GE knew of a design flaw in the fuel system of the helicopter's engine. They pointed to an e-mail the day after the accident which discussed the size of the fuel filter. The internal document indictated that the military version of the helo uses a much finer filter in the fuel system. Plaintiffs' attorneys also said that GE had known of a problem with a fuel valve on the aircraft, but according the the Portland Oregonian, they did not correct the problem, treating it like a service issue.

While the families of most of those fatally injured in the accident took out-of-court settlements, the suit against GE was brought by William Coultas, the surviving pilot, the estate of Roark Schwaneberg, the pilot who did not survive, and Coultas' wife. The jury awarded $28.4 million to the estate. Coultas received $37 million, and his wife was awarded $4.3 million by the jury.

The jury found that GE was 57 percent at fault for the accident, and placed the rest of the blame on the helicopter's owner and Sikorsky, according to a report from the Associated Press. The NTSB probable cause report, which is not admissible as evidence in court, found that the fact that the helicopter was overloaded was the reason for the accident, with lack of oversight as a contributing factor. A GE spokesman said the company would appeal, but it must first look at the full language of the verdict.

FMI: www.ge.com

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC