Gulfstream G500 Completes Flutter Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 10, 2016

Gulfstream G500 Completes Flutter Testing

Company Hopes To Certify The Airplane In 2019

Gulfstream has completed flutter testing on the G500, achieving another milestone in the new aircraft’s flight-test program. The first G500 test aircraft, T1, performed the tests over the course of more than 50 flights.

“The G500 has accomplished a great deal since we launched the flight-test program in May 2015,” said Dan Nale, senior vice president, Programs, Engineering and Test, Gulfstream. “With three aircraft in flight, the program has surpassed 430 flight-test hours over more than 105 flights. This latest accomplishment, as well as the outstanding performance and reliability of all three flight-test aircraft, highlights the tremendous progress being made. The flight-test team has started the new year off with great success.”

As T1 performed flutter testing, the second test article, T2, finished climatic chamber testing at the McKinley Climatic Laboratory, Eglin Air Force Base, Florida. The aircraft endured three days of hot testing, with temperatures reaching 131 degrees Fahrenheit/55 degrees Celsius, followed by two days of cold testing, with temperatures as low as -40 degrees F/-40 degrees C.

Since T1 took its first flight on May 18, 2015, the aircraft has surpassed more than 320 flight hours. It has reached a maximum speed of Mach 0.999 and a maximum altitude of 53,000 feet/16,154 meters. T1’s longest flight to date lasted more than five hours. Additional test activities are continuing on track, including envelope expansion, air data system testing, aero performance, brakes and field performance, handling qualities and flight controls.

The second and third G500 flight-test aircraft, T2 and T3, both took their first flights on Nov. 20, 2015. In addition to the climatic chamber testing, T2 is focusing on flight loads validation, along with aircraft performance and systems testing.

T3 is the primary test bed for the all-new Symmetry Flight Deck.  T3 will also be used to evaluate ice-protection system performance, landing gear and nosewheel steering operation, environmental control system performance and the cabin pressure control system, as well as community noise testing. T3’s longest flight to date lasted more than six hours.

In addition to the three aircraft currently flying, the G500 flight-test program will include two more aircraft. T4 has been inducted into the Flight Test facility and is in the final stages of flight preparation. P1 is a fully outfitted production aircraft that will test the interior elements as well as complete integration of the aircraft systems with the passenger experience.

The G500 is part of Gulfstream’s new family of clean-sheet aircraft, the G500 and G600 . Gulfstream has conducted more than 43,000 hours of testing for both aircraft in Gulfstream’s state-of-the-art lab facilities.

The G500 can fly 5,000 nautical miles at Mach 0.85 or 3,800 nm at Mach 0.90. The aircraft is powered by the new Pratt & Whitney Canada PW814GA engine, which delivers excellent fuel efficiency, fewer emissions and less noise.

The G500 is expected to receive type certification from the U.S. Federal Aviation Administration and European Aviation Safety Agency in 2017. It is scheduled to enter service in 2018, with the G600 following in 2019.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC