X2 Technology Helicopter Design Proposed To US Army | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 01, 2013

X2 Technology Helicopter Design Proposed To US Army

Boeing, Sikorsky Partner To Enter Joint Multi-Role Future Vertical Lift Demonstration Program

Sikorsky and Boeing will submit a joint proposal to build a demonstrator aircraft -- based on Sikorsky’s X2 Technology rotorcraft design -- for the U.S. Army's Joint Multi-Role (JMR) Technology Demonstrator (TD) Phase 1 program. The JMR TD program supports the Army's Future Vertical Lift initiative to deliver the next generation of vertical lift utility and attack aircraft.

"The Sikorsky and Boeing proposal will demonstrate how X2 Technology, with its counter-rotating coaxial main rotors, pusher propeller, and advanced fly-by-wire system, will deliver efficient 230-knot cruise airspeed, improved hover efficiency, and weight-optimized design in an affordable package," said Samir Mehta, president of Sikorsky Military Systems. "By leveraging our proven design, we can offer the Army reduced risk, a 100-knot improvement in speed, a 60 percent improvement in combat radius, and 50 percent better high-hot hover performance."
 
"The Sikorsky-Boeing team for JMR TD is truly a team of equals," said Leanne Caret, vice president and general manager of Boeing's Vertical Lift division. "Sikorsky will take the lead role in this JMR TD Phase 1 proposal, and Boeing will take a lead role for Phase 2, the mission systems demonstrator program.
 
"Our companies are fully committed to the long-term nature of the Future Vertical Lift initiative, and we will contribute equally in terms of capital, technological capability and risk on our path to meeting the Army's requirements," said Caret.
 
Proposals for JMR TD Phase 1 are due to the U.S. Army Aviation Applied Technology Directorate by March 6. The Army is expected to announce its selection of one or more winning bids in late 2013. Demonstrator aircraft are expected to fly in 2017.

(Image provided by Boeing)

FMI: www.sikorsky.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC