Diamond Rolls Out D-Jet S/N002 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jul 20, 2007

Diamond Rolls Out D-Jet S/N002

First Flight Expected In August

On Friday, July 20, 2007 Diamond Aircraft celebrated the roll out of its second single-engine D-Jet, S/N002.  S/N002 is the first D-Jet intended to conform to the expected production configuration in its structural layout, and aerodynamic design.

From the photos, the most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as deicing surfaces on the leading edges of the wing, and horizontal and vertical stabilizers. The production-spec aircraft also incorporates a pair of small stablizers on the underside of the empennage, added to the prototype during flight testing, as well as what appears to be an aluminum-framed forward windscreen.

The D-Jet team is now preparing S/N002 for first flight next month, while simultaneously building the next three certification test planes on the same production-spec tooling used for S/N002.

The most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as a larger windshield on the production-spec aircraft.

Diamond expects to certify the D-Jet by in mid-2008, with deliveries starting immediately thereafter.

The London, Ontario planemaker reports demand for the D-Jet has been very strong, with over 300 orders taken world-wide. The North American retail delivery schedule is completely sold out for the first year and a half of production, with only a very limited number of Premium deposit slots available for late 2009 delivery from select Diamond Distributors.

FMI: www.diamondair.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC