Pad 39A Conversion Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Nov 24, 2014

Pad 39A Conversion Underway

SpaceX Modifying The Historic Site For Its Falcon Heavy Rocket

Modifications of launch Pad 39A at the Kennedy Space Center are underway, as SpaceX prepares for the first launch of a Falcon Heavy rocket from the historic facility.

The pad was mothballed by NASA and the Kennedy Space Center after the shuttle program ended in 2011. It was one of the last visible reminders of that era of space travel.

With all SLS launches planned for pad 39B, NASA awarded the right to repurpose 39A to SpaceX, and the private company hopes to be able to launch the first of its new heavy rockets next summer.

NASASpaceflight.com reports that most of the work currently underway seems to be on the perimeter of the launch site, and a SpaceX says that the pad will retain much of its current appearance. For Instance, according to SpaceX spokesman John Taylor, the Rotating Service Structure (RSS) that had been an integral part of the payload installation process for the Shuttle will remain in place. There had been speculation that SpaceX would also add to the Fixed Service Structure (FSS) at the pad, but Taylor said that for now, it will remain at its current height, but with some structural reinforcements.

A date of July 1, 2015 has been set for a "Wet Dress Rehearsal" (WDR) for the Falcon Heavy to validate the rocket and launch systems. The next steps would be a Static Fire test and a Launch Readiness Review before the actual first flight test is conducted.

(NASA image of Discovery at Pad 39A)

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC