Air Force Officials Concerned About Ares I-X Rocket Flight Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jun 30, 2009

Air Force Officials Concerned About Ares I-X Rocket Flight Test

Vibrations During Launch Might Cause Severe Problems, USAF Says

 Air Force Officials, who are charged with safety during launch operations at Kennedy Space Center, are concerned that harmonic vibrations from the cluster of solid rocket boosters used on the Ares I-X could knock out both the launch vehicle's Thrust Vector Control and self destruct mechanism. The result, officials say, could be extremely dangerous for people living along Florida's east coast.

The concerns may delay or even cancel the planned August 30th test launch, according to an exclusive report in The Orlando Sentinel.

While the solid rocket boosters are proven technology, Jon Cowart, NASA's deputy Ares I-X program manager, told the paper that  "if you change little things, it's amazing the amount of reanalysis you have to go do. You're not starting from scratch. But you're not as far down the road as you probably thought you were."

The Ares-I will eventually carry astronauts back to the moon, but those missions aren't planned for more than a decade.

Engineers used the same self-destruct mechanism on the Ares I-X as are used on the shuttle, but the vibrations during launch are apparently much more severe. According to internal NASA documents obtained by the paper, the vibrations with enough force to knock out the self-destruct mechanism could come 60-90 seconds into the flight, with a TVC failure coming as much as 2 minutes into the flight. The Air Force requires an assurance that the self-destruct system will work properly, 99.9 percent, according to Lt. Col. Loretta Kelemen, head of the Cape Canaveral Air Force Station 45th Space Wing Range Safety Office. "If they do not meet our requirements, then they do not launch here."

Cower told the paper he doesn't think the vibrations, which are called "sympathetic" among the SRB's and could cause the vehicle to act like a tuning fork, will ever be severe enough to effect either the Thrust Vector Control or the Flight Termination System. "We've done our analysis one way. They do it another way."

FMI www.nasa.gov, www.patrick.af.mil/

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC