Sun, Mar 14, 2010
Falcon 9 Test Was Delayed After An Abort On Tuesday
Today, SpaceX announced a
successfully test firing of the inaugural Falcon 9 launch
vehicle at Space Launch Complex 40 located at Cape Canaveral,
FL. SpaceX is one of two commercial companies selected to
receive NASA funding in support of cargo flights to the
International Space Station.
Following a nominal terminal countdown, the launch sequencer
commanded ignition of all 9 Merlin first stage engines for a period
of 3.5 seconds. This short test firing is enough time to
verify systems on the ground and in the launch vehicle are
completely ready for an actual launch.
Earlier in the week, the test was aborted due to an anomoly in
the ground systems supporting the rocket. A software glitch
was discovered and corrected.
Just prior to engine ignition, the pad water deluge system was
activated providing acoustic suppression to keep vibration levels
within acceptable limits. The test validated the launch pad
propellant and pneumatic systems as well as the ground and flight
control software that controls pad and launch vehicle
configurations.
File Photo of Falcon 9 at Complex 40
"This is analogistic to a run-up an aircraft might do on the
runway to verify all systems are functional," SpaceX founder and
CEO Elon Musk remarked in a recent interview. "That gives the
rocket a nice final shakedown. We will then double-check everything
to make sure everything's OK after that short static fire. If it's
looking good, then we launch soon thereafter."
The completion of a successful static fire is the latest
milestone on the path to first flight of the Falcon 9 which will
carry a Dragon spacecraft qualification unit to orbit. SpaceX
must fly their cargo module successfully before being allowed to
attempt a docking with the space station.
More News
Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]
A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]
Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]
Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]
From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]