ISS Update: The Air We Breathe | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Aug 10, 2003

ISS Update: The Air We Breathe

Lu, Malenchenko Repressurize ISS, Deal With Shut-Down

The Expedition 7 crew, Commander Yuri Malenchenko and NASA International Space Station Science Officer Ed Lu, continued work this week with unique microgravity science experiments and maintained the operating systems of the orbiting lab.

On Monday, the crewmembers passed the 100-day mark on orbit since their launch to the Station April 26. The crew is scheduled to return to Earth in late October aboard the same Soyuz vehicle they arrived in. The Expedition 8 crew, U.S. astronaut Michael Foale and Russian cosmonaut Alexander Kaleri, will replace the Expedition 7 crew. Foale and Kaleri are scheduled to launch to the Station Oct. 18 aboard a Russian Soyuz spacecraft, along with European Space Agency astronaut Pedro Duque of Spain. Duque will then return to Earth with the Expedition 7 crew after completing more than a week of science activities aboard the Station. Foale, Kaleri and Duque will talk to reporters about their upcoming mission during a news conference at 3 p.m. EDT, Thursday, Aug. 14, at the Johnson Space Center, Houston, which will be broadcast on NASA TV.

Throughout the week aboard the ISS, Lu worked with a run of the Coarsening of Solid-Liquid Mixtures-2 (CSLM-2) experiment in the Microgravity Science Glovebox. CSLM-2 is studying how the strength of metals, such as those used in jet engine turbine blades, is reduced during a process called coarsening. Malenchenko worked with Earth observation experiments and wrapped up a Russian agriculture experiment studying the growth of plants in space. He saved the data from the Rasteniya-2 experiment in preparation for its return to Earth.

Tuesday, the Station operating system briefly shifted into “survival mode” when the on-board computers did not recognize both thermal system loops in the Russian segment. Nonessential systems were automatically turned off, but flight controllers and payload controllers worked with the crew to reactivate the operating and payload systems without major impacts to operations or science.

Lu and Malenchenko resized a spare U.S. spacesuit to fit Lu. Malfunctions in Lu’s original suit were found during a test earlier in the mission and the larger modular-designed suit was easily adjusted to fit Lu in the event he needs to conduct a U.S. airlock-based spacewalk. Initially, during the fit check of the suit, the cooling system did not function correctly but began working later in the test. Spacesuit experts will continue to troubleshoot the issues with both spacesuits.

This week, Malenchenko used oxygen from the Progress cargo vehicle docked to the aft of the Zvezda Service Module to repressurize the Station. The extra oxygen is being used before the spacecraft is undocked later this month to make room for a new Progress resupply craft scheduled for launch to the Station Aug. 28 (U.S. time).

FMI: http://spaceflight.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC