Raytheon Aircraft Company Certifies Heavy-Weight Beechcraft King Air 350 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 21, 2005

Raytheon Aircraft Company Certifies Heavy-Weight Beechcraft King Air 350

Has Heavy-Weight Gear, Airframe Mods

Raytheon Aircraft Company says it's received commuter category certification of a heavy-weight Beechcraft King Air 350. This new aircraft has been modified to incorporate heavy-weight landing gear, as well as several other airframe modifications, permitting it to operate at a maximum gross takeoff weight of 16,500 pounds, an increase of 1,500 pounds over a standard Beechcraft King Air 350.

"This certification represents the achievement of a significant milestone in developing and certifying the Beechcraft King Air 350ER which Raytheon unveiled at the Paris Air Show earlier this summer," said John Brauneis, vice president of contracts and special mission aircraft. "Our next step is to complete the development and certification of the nacelle fuel tanks which, when added to a heavy-weight Beechcraft King Air 350, will yield a Beechcraft King Air 350ER."

Aimed specifically at the special mission market, the Beechcraft King Air 350ER will have the capacity for extended endurance, flying out 100 nautical miles, performing a low altitude surveillance mission for up to 8 hours and flying back 100 nautical miles, and still land with over 45 minutes of fuel on board.

"When fully certified, the Beechcraft King Air 350ER will surpass anything in its class in payload and endurance. It will provide the proven reliability of the King Air and unparalleled cost-effectiveness over a wide variety of military and civilian special missions," added Brauneis. Certification of the King Air 350ER is still slated for the summer of 2006.

In 2004, Raytheon Aircraft Company recognized the 40th anniversary of Beechcraft King Air continuous production -– and celebrated by delivering the 6,000th Beechcraft King Air. Over that same period of time, Raytheon Aircraft Company has been producing missionized aircraft to meet the unique requirements of its government and military customers, and has delivered over 3,000 special mission aircraft around the world.

FMI: www.raytheonaircraft.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC