First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 18, 2010

First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed

Three-Hour Flight Tested All Operator Workstations

P-8A Poseidon aircraft T2 successfully completed the program's first mission systems test flight on June 8 in Seattle, Boeing announced Thursday. T2 will be used to verify integrated mission systems performance during flights in Seattle and at Naval Air Station Patuxent River, MD.


P-8 Poseidon T2 File Photo

During the three-hour flight, the joint Boeing and Navy test team exercised mission computing on all five operator workstations and successfully demonstrated key systems -- including acoustics, mission planning, tactical data-link, communications, electronic support measures and flight test instrumentation -- for the first time.

"This successful flight moves us a step closer to getting the Poseidon and its next-generation radar and sensors into the hands of the warfighter," said Chuck Dabundo, Boeing vice president and P-8 program manager. "Future flights will demonstrate the state-of-the-art systems that will provide the Navy superior performance well into the 21st century."


P-8 Poseidon File Photo

T2 is one of five test aircraft that are being assembled and tested as part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004. Boeing's T1 airworthiness-test aircraft entered flight testing in October 2009 and arrived at the Navy's Patuxent River facility in April 2010.

The Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC