General Atomics Awarded Initial EMALS Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 18, 2014

General Atomics Awarded Initial EMALS Contract

System Will Be Installed On Future Aircraft Carrier John F. Kennedy

U.S. Naval Air Systems Command (NAVAIR) awarded General Atomics (GA) an initial sole-source contract for Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) for the CVN 79 aircraft carrier to be named John F. Kennedy.

This contract is for the initial procurement of the long-lead-time materials in support of a full production contract for installation of EMALS and AAG into CVN 79, the second of the Gerald R. Ford-class aircraft carriers. CVN 79 is scheduled to be delivered to the U.S. Navy in 2023.

GA Electromagnetic Systems Group will manufacture EMALS and AAG components at its state-of-the-art 367,000 square foot manufacturing facility in Tupelo, Miss.

“These are exciting times. We are beginning EMALS and AAG production for the second ship in the class, CVN 79, as these systems are being integrated into the Gerald R. Ford (CVN 78). We are proud to be part of the team that is putting cutting-edge technology into the world’s premier aircraft carriers and into the hands of Naval forces,” says Dean Key, Director of Launch and Recovery Production Programs, General Atomics.

GA was awarded the prime contract to provide EMALS and AAG systems for CVN 78 in June 2009 and is manufacturing the CVN 78 hardware concurrently with the System Design and Demonstration (SDD) programs. Hardware delivery to CVN 78 is scheduled to be completed in 2014.

(Image provided by General Atomics)

FMI: www.navy.mil, www.ga.com

 


Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC