NASA Hopes 'Phoenix' Rises From Ashes Of Past Mars Failures | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, May 03, 2007

NASA Hopes 'Phoenix' Rises From Ashes Of Past Mars Failures

Third Probe Set For August Launch

The University of Arizona in Tucson is preparing to launch a Mars probe in August, from NASA's Kennedy Space Center... and the craft will have much to prove. Mars missions have held more than their share of disappointments lately.

The $386 million mission will attempt to drill the surface of the Martian polar region, looking for signs of water and life. First, however, it must complete a successful launch... and survive its 10-month journey to the red planet.

Then, it must land and avoid shutting off its rocket engines 130 feet above the ground, like 1999's Mars Polar Lander did. The resulting crash destroyed that probe, and halted NASA's 2001 Mars Surveyor program.

In the hopes the new probe will be a success, it has been named Phoenix... after the mythical bird which dies in a fire, but is reborn from the ashes. But there will be nothing hot about the existence of this Phoenix.

NASA states the polar ice caps of Mars are so cold they're actually made of dry ice, or frozen carbon dioxide. Phoenix is expected to operate for about five months before it succumbs to temperatures of minus 120 degrees Fahrenheit.

Phoenix is scheduled to blast off August 3... six years later than originally planned.

FMI: www.nasa.gov/missions/solarsystem/phoenix_water.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC