Bombardier Completes Ultimate Load Test On CSeries Aircraft Demonstrator Wing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 22, 2010

Bombardier Completes Ultimate Load Test On CSeries Aircraft Demonstrator Wing

Test Places 150% Of Highest Possible Normal Load On Wing Surface

Bombardier Aerospace in Belfast has completed the ultimate load test on the CSeries aircraft composite demonstrator wing, successfully replicating 150 per cent of the most severe forces the wing is ever likely to experience in service.

The Belfast operation is responsible for the design, manufacture and integration of the complete wing for the CSeries aircraft, including all flight control surfaces and high lift systems. A key feature is the composite torque box, which is being produced using Belfast's innovative Resin Transfer Infusion composite technology. As part of the complex research and development programme, a full-scale, three-quarter span pre-production demonstrator wing was assembled, which has been undergoing rigorous testing.


Artist's Concept

Loads were progressively increased on the demonstrator wing in order to simulate aerodynamic, landing gear and engine pylon forces, until ultimate loading was successfully achieved.

"We are now assessing the data from the thousands of strain gauges, and are delighted with the results we've obtained so far," said Michael Ryan, Vice President and General Manager, Bombardier Aerospace, Belfast. "The data will help us to optimize the final production design for weight and performance. This successful demonstrator test confirms that our Resin Transfer Infusion process is an excellent means by which to manufacture the large primary structural elements of the composite wing torque box for the CSeries aircraft."


CSeries Wing Test File Photo

Having successfully achieved ultimate loading, Bombardier engineers are continuing to carry out further tests on the demonstrator wing to assess the wing's capability of sustaining various types and levels of damage. This will also allow them to ensure that repair systems are proven before the aircraft enter into service.

"We want to take every opportunity to learn as much as we possibly can before we finalize the wing design and start production. We are focusing on and testing various areas so we can be absolutely confident in the structure and its maintainability. This is another means by which we are building confidence amongst our customers and potential customers," Mr. Ryan added.

In addition to the assembly and testing of the demonstrator wing, Bombardier Aerospace, Belfast has carried out over 4,000 individual material, structural detail and sub-component development tests to prove out the design, manufacturing and assembly technologies being employed.

Production of the CSeries aircraft wings is due to get under way early in 2011 in a new 600,000 sq ft (55,742 m2) purpose-built factory in Belfast, the first phase of which is nearing completion.


CSeries Wing Test File Photo

Since launching the CSeries family of aircraft at the Farnborough Air Show in July 2008, Bombardier has recorded firm orders for a total of 90 CSeries aircraft, comprising a firm order from Republic Airways for 40 CS300 aircraft, a firm order from Deutsche Lufthansa AG for 30 CS100 aircraft, and one from Lease Corporation International Group for 17 CS300 and three CS100 aircraft. The programme has also booked options for an additional 90 CSeries aircraft. The CSeries aircraft, which is optimized for the single-aisle 100- to 149-seat market, will deliver the lowest operating costs in its class, exceptional operational flexibility, widebody comfort and an unmatched environmental scorecard.

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC