Boeing Opens Propulsion Systems Facility In South Carolina | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Feb 12, 2015

Boeing Opens Propulsion Systems Facility In South Carolina

Plant Will Manufacture Components For 737 MAX, 777X Airplanes

Boeing has opened a new propulsion engineering and assembly facility in North Charleston.

The team of engineers, manufacturing and support personnel at Propulsion South Carolina (PSC) are responsible for the design and assembly of the 737 MAX engine nacelle inlet, the design of the 737 MAX engine nacelle fan cowl and the design and engineering integration for the 777X nacelle. PSC employees have worked in other Boeing South Carolina facilities while the new building was under construction.

Propulsion South Carolina was established in May 2013 to build capability and capacity in integrated propulsion system design and assembly to support growth and enhance the performance of future airplanes. Boeing has relied on its supply chain to perform the majority of propulsion system design and assembly during the last 10 to 15 years, but is strategically bringing some of that work in-house.

Boeing Commercial Airplanes president and CEO Ray Conner was joined at the grand opening event by Governor Nikki Haley and other elected officials, community representatives and Boeing employees.

“The new propulsion center demonstrates our confidence in the Boeing South Carolina workforce and Boeing’s commitment to the state,” Conner said. “Our investment in both South Carolina and Washington state will help enable Boeing to be a preferred provider to customers and capture future airplane market demand by delivering competitive and high-performing products such as the 737 MAX and 777X.”

The 225,000 square foot facility will include state-of-the-art automated manufacturing equipment to efficiently assemble the 737 MAX engine nacelle inlets when production begins later this year. It also provides office space for engineering design, production and support staff.

(Images from file)

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC