Astronauts Complete Second STS-126 Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Nov 21, 2008

Astronauts Complete Second STS-126 Spacewalk

Replace 11 Of 12 Bearings In Solar Array Joint

The crew of the International Space Station celebrated the orbiting lab's 10th anniversary Thursday with a spacewalk by astronauts Heidemarie Stefanyshyn-Piper and Shane Kimbrough.

The second of four planned spacewalks planned for STS-126 began 45 minutes early, at 12:58 pm EST, and ended at 7:43 pm, running 15 minutes longer than its scheduled 6-and-a-half hours. Replacement of 11 of the 12 trundle bearings in the starboard Solar Alpha Rotary Joint race ring was successfully completed.

The repair comes almost a year after astronaut Dan Tani, in a spacewalk on November 24, 2007, noticed metallic debris on a main gear bearing race, suggesting metal-on-metal grinding which could lead to a failure of the joint.

The bearings allow rotating the solar array to track the position of the sun, which is essential to maximize power generation. The first of the 12 bearings was replaced back in June.

Now safely put in the shuttle Endeavour's payload bay, the bearings will be returned to Earth, where they'll be inspected, and engineers will try to determine what caused premature failure by subjecting the remaining good bearings to further analysis.

FMI: www.nasa.gov/station

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC