CAP Performing Critical Role In STS-107 Debris Search | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Feb 11, 2003

CAP Performing Critical Role In STS-107 Debris Search

We're pleased to note that a talented auxiliary military resource is finally getting the chance to use their immense expertise in Search and Recovery to help in finding answers to one of the greatest tragedies in recent memory... the loss of Space Shuttle Columbia. One of our favorite ANN News-Spies passed along the following data in order to make sure that the very dedicated folks who comprise CAP were recognized for the valued effort they're making... and we couldn't be more pleased to share it with you. Here's a a look at their recent efforts...

CAP Mission Summary - Task Force Columbia

NASA has tasked CAP with airborne shuttle debris identification missions in Texas. All missions have centered around rural areas south and west of Dallas/Fort Worth.

The results for this past weekend are as follows:

8 Feb 03
  1. 3 TX Wing aircraft were utilized on 4 sorties. (6 flights were cancelled due to weather.)
  2. CAP flew 8.5 hours and 40 CAP members were involved in the missions.
  3. 3 potential targets were reported to NASA for follow-up.
  4. No targets have been confirmed as Shuttle Columbia debris. 3 potential targets reported were checked out by NASA ground crews and determined to be insignificant.
9 Feb 03
  1. 6 TX Wing aircraft were utilized on 14 sorties. (12 flights were cancelled due to weather.)
  2. CAP flew 20.1 hours and 40 CAP members were involved in the missions.
  3. 15 potential targets were reported to NASA for follow-up.
  4. No targets have been confirmed as Shuttle Columbia debris. 8 of the 15 potential targets have been checked out by NASA ground crews and determined to be insignificant. The remaining targets will be verified on 10 February 2003.

Cumulative: 28.6 hours flown.

15 sorties are scheduled for 10 Feb. Weather conditions are favorable for air operations 10-11 Feb 03.

FMI: www.capnhq.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC