Astronaut Steve Bowen Named To STS-133 Space Shuttle Crew | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 20, 2011

Astronaut Steve Bowen Named To STS-133 Space Shuttle Crew

Will Replace Tim Kopra, Who Was Injured Over The Weekend

NASA selected astronaut Steve Bowen as a mission specialist on STS-133, the next space shuttle mission planned for launch on Feb. 24. Bowen replaces astronaut Tim Kopra, who was injured in a bicycle accident over the weekend.


(L-R) Steve Bowen, Tim Kopra

"Tim is doing fine and expects a full recovery. However, he will not be able to support the launch window next month," said Peggy Whitson, chief of the Astronaut Office at NASA's Johnson Space Center in Houston. "If for some unanticipated reason STS-133 slips significantly, it is possible that Tim could rejoin the crew."

The crew change should not affect the mission's target launch date.

"Steve is an ideal candidate, and we have complete confidence he'll contribute to a fully successful STS-133 mission," Whitson said. "He has performed five prior spacewalks. That extensive experience, coupled with some adjustments to the spread of duties among the crew, will allow for all mission objectives to be accomplished as originally planned in the current launch window."

Bowen will begin training this week with the STS-133 crew, which includes Commander Steve Lindsey, Pilot Eric Boe, and Mission Specialists Alvin Drew, Michael Barratt and Nicole Stott. Bowen also will train to perform the two planned spacewalks of the mission. He will join Alvin Drew to move a failed ammonia pump and perform other external configurations to the station.

The STS-133 mission to the International Space Station will deliver the Permanent Multipurpose Module, an external platform that holds large equipment and critical spare components for the station. The mission also will deliver Robonaut 2, or R2, the first human-like robot in space.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC