Aura Launch Scrubbed... Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 15, 2004

Aura Launch Scrubbed... Again

Battery Glitch

The launch of NASA's Aura spacecraft atop a Boeing Delta II rocket was scrubbed Wednesday because of an issue with one of the two batteries on the second stage of the Delta II launch vehicle. At approximately three minutes before the scheduled liftoff time, as the batteries were being transferred to internal power, the battery current level dropped below prescribed limits, triggering a launch hold.

Engineers and mission managers are assessing the situation and deciding on a date for the next launch attempt. Two options are being considered. The first is to attempt a launch on Thursday morning, July 15, during a three-minute launch window that opens at 6:01:59 a.m. EDT (3:01:59 a.m. PDT). The second option under consideration is to stand down until Saturday, July 17, due to range conflicts at Vandenberg Air Force Base.

Weather is a concern for a launch attempt on Thursday morning. The current forecast calls for only a 60 percent probability of acceptable weather conditions. The primary concerns are for thick clouds and the possibility of triggered lightning in the launch area due to the remnants of daytime thunderstorm activity in Southern California. In addition, Tropical Storm Blas, off the coast of Baja California, could prevent a P3 aircraft from flying to its launch support position. The P3 relays telemetry from the launch vehicle back to the launch team at Vandenberg.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC