G250 Completes Natural Icing Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Mar 26, 2011

G250 Completes Natural Icing Tests

Aircraft Now Involved In Function And Reliability Testing

Gulfstream's second G250 flight-test aircraft has recently successfully completed natural icing tests, bringing the aircraft several steps closer to its certification later this year by the FAA and the Civil Aviation Authority of Israel. Serial Number (S/N) 2002 left its home base in Israel last month, crossed the Atlantic and landed in Smryna, TN, where it spent several weeks flying to the Great Lakes region to hunt for natural icing conditions aloft.

The G250 successfully completed the test points required for certification, including allowing ice to build up on the aircraft's unprotected surfaces and then verifying the aircraft's stability and control characteristics, as well as evaluating the ice protection systems and the tolerance of the aircraft after being exposed to icing conditions for 45 minutes. "The G250 performed exceptionally well," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "During one particular flight, the crew encountered icing concentrations in excess of the regulatory design envelope. The aircraft remained in this condition for an equivalent icing exposure time of more than 50 minutes to allow adequate accumulation of ice. Despite the extremely demanding conditions and ice accumulation on all untreated surfaces, the aircraft performed flawlessly."

The anti-ice system on the leading edge of the G250 wing was adapted from large-cabin Gulfstream aircraft. Heated bleed air from the engines is routed to the leading edges to prevent ice formation. S/N 2002 will now undergo overnight cold-soak trials, having completed a similar test in Finland. The aircraft has also completed hot-weather testing on the coast of the Red Sea.

S/N 2003 has started function and reliability testing in Israel, where the G250 is manufactured in cooperation with Israel Aerospace Industries (IAI). Function and reliability tests demonstrate that the aircraft, its components and its systems consistently operate as expected. Reaching this point is considered a major milestone toward certification. 

With flight test well under way, manufacturing continues for the first production aircraft, S/N 2004. The empennage and wing have been joined to the fuselage, and installation of the aircraft's systems has begun. Component-level fatigue testing on the main landing gear and rudder continues, while the full-up fatigue test article, S/N 1999, proceeds with preparation for testing over 40,000 cycles.

The three aircraft in the flight-test program have already accrued more than 955 hours in 324 flights.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC