Astronauts Check Suits Following Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Fri, Jul 03, 2020

Astronauts Check Suits Following Spacewalk

Wednesday’s Spacewalk Swapped Batteries And Route Cables On The Station’s Starboard-6 Truss Structure

Spacesuit checks were on the schedule Thursday for the Expedition 63 crew following a spacewalk to replace aging batteries on the International Space Station. The orbital residents also juggled a variety of science activities.

NASA astronauts Chris Cassidy and Bob Behnken are back to work now after Wednesday’s spacewalk to swap batteries and route cables on the station’s Starboard-6 truss structure. The duo recharged batteries and refilled water tanks inside their U.S. spacesuits. Flight Engineer Doug Hurley also joined the pair in the afternoon for eye scans with an ultrasound device.

All three astronauts called down to Mission Control today and briefed specialists with the results of the mission’s second spacewalk. Station managers will assess the orbital lab’s upgraded power status before scheduling more battery swap spacewalks later this month.

Cassidy also configured cables on a specialized furnace before uploading new software to the high-temperature research device. Hurley worked with experiment hardware that seeks to better control the separation of blood cells and plasma to improve medical diagnostic devices.

Cosmonauts Anatoly Ivanishin and Ivan Vagner partnered up Thursday morning for cardiac research. The duo is studying how the heart reacts to a unique suit that reverses the flow of blood towards the head caused by weightlessness. The pair then split up for life support maintenance and radiation checks.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (06.01.24): Hold For Release

Hold For Release Used by ATC to delay an aircraft for traffic management reasons; i.e., weather, traffic volume, etc. Hold for release instructions (including departure delay infor>[...]

ANN's Daily Aero-Linx (06.01.24)

Aero Linx: International Academy of Aviation and Space Medicine (IAASM) The Academy was founded in 1955, with the object of searching for and promoting new knowledge in Aviation an>[...]

Aero-News: Quote of the Day (06.01.24)

“As FedEx begins its journey to restructure under the ‘One FedEx’ strategy, our pilots remind management that there’s still unfinished business to address i>[...]

Airborne 05.31.24: 1Q GA Sales, 200th ALTO LSA, Spitfire Grounding

Also: NATA CEO In Legal Dilemma, WestJet Encore Settle, Drone Bill H.R. 8416, USN Jet Trainer GAMA released their 1Q/24 GA Aircraft Shipment and Billing Report -- with mostly mixed>[...]

ANN's Daily Aero-Term (06.02.24): Mach Technique [ICAO]

Mach Technique [ICAO] Describes a control technique used by air traffic control whereby turbojet aircraft operating successively along suitable routes are cleared to maintain appro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC