RSS Wrapped Around Atlantis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.29.14 ** HD iPad-Friendly -- Airborne 09.29.14**
** Airborne 09.26.14 ** HD iPad-Friendly -- Airborne 09.26.14 **
** Airborne 09.24.14 ** HD iPad-Friendly -- Airborne 09.24.14 **

Sat, Jun 04, 2011

RSS Wrapped Around Atlantis

Endeavour Prepped For System Purge

At NASA Kennedy Space Center's Launch Pad 39A, teams have closed the rotating service structure (RSS) around space shuttle Atlantis. The RSS provides access to the shuttle and helps protect the spacecraft from the elements.


File Photo

Engineers have reviewed data from a lightning strike nearly half a mile from the pad on Wednesday. No issues have been seen due to the strike. An engineering team also will perform a visual inspection walkdown at the pad.

Friday, technicians connected the forward reaction control system quick disconnects and check them for leaks, over the weekend, teams will connect and check the quick disconnects for the auxiliary power system.

Meanwhile, technicians in Kennedy's Orbiter Processing Facility-1 prepared Endeavour on Friday for this weekend's purging of the vehicle's orbital maneuvering system chemicals.

FMI: www.nasa.gov

Advertisement

More News

Airborne 09.29.14: Young Eagle Tragedy, Overdue Hoover Honors, Paperplane Record

Also: Low-Flying F16, UAVs For The Movie, Aerobatic Pilot Bails Out, Bombardier Safety Stand Down, MVP Takes On The World We are sad to report that a Young Eagle flight went down o>[...]

Airborne 09.29.14: Young Eagle Tragedy, Overdue Hoover Honors, Paperplane Record

Also: Low-Flying F16, UAVs For The Movie, Aerobatic Pilot Bails Out, Bombardier Safety Stand Down, MVP Takes On The World We are sad to report that a Young Eagle flight went down o>[...]

Airborne 09.26.14: A320neo First Flight, Aspen ESV Trial, Garmin Flies G5000

Also: Sea Lynx Grounding, AEA's Ric Peri On FAR 145, Union v Allegiant, Wingboarding--Anyone? Things went off as planned in Toulouse, France yesterday morning when the A320neo made>[...]

ANN's Daily Aero-Linx (09.30.14)

DOT Rule for Passengers Traveling with Lithium Batteries The issue has come to the forefront as more people may soon begin traveling with small UAVs, most of which are powered by t>[...]

ANN's Daily Aero-Term (09.30.14): Filed En Route Delay

Any of the following preplanned delays at points/areas along the route of flight which require special flight plan filing and handling techniques.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC