Aerojet Rocketdyne’s Affordability And Efficiency Drive Major Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 10, 2019

Aerojet Rocketdyne’s Affordability And Efficiency Drive Major Milestones

Company Credits Competitive Improvement Program For The Success

Nearly four years into an aggressive five-year affordability drive, Aerojet Rocketdyne reports that it has already achieved its top major milestones – including relocation of manufacturing capabilities for three key missile defense program products across the country, and elimination of more than 1.1 million square feet of the company’s office and manufacturing space.

In March 2015, the company first launched its Competitive Improvement Program (CIP) aimed at reducing product costs and increasing operational efficiency among its 15 sites across the country.

A major component of the initiative was the transfer of production of three key defense-related propulsion programs from the Sacramento, California, site to the company’s sites in Camden, Arkansas, and Orange County, Virginia, that had similar manufacturing capabilities. Through a meticulous program management and risk reduction schedule, the company was able to build and replicate capabilities and execute the knowledge transfer needed to stand up and certify production at the receiving sites. In December 2017, one customer took first product deliveries of the two divert attitude propulsion programs that were transferred to Virginia, and in July 2018, another customer took first deliveries of a critical large solid rocket motor program that was transferred to Arkansas.

“When we launched CIP and announced our company-wide consolidation plans, we acknowledged it was a bold move but one that we felt was essential to sustaining our competitiveness in the increasingly dynamic aerospace and defense sector,” said Aerojet Rocketdyne Chief Operating Officer Mark Tucker, executive champion of the effort. “I’m proud to say we’ve done exactly what we promised we’d do. Not only were we able to successfully duplicate our complex production requirements at other sites, but we retained critical personnel and improved product flow along the way through agile, modernized facilities that are now right-sized for the products we transferred. Best of all, we accomplished the program transfers without impact to the quality of the products we deliver, and engaged our customers throughout the process to share in the production and test milestones.”

Another goal of Aerojet Rocketdyne’s CIP was reduction of the company’s 15-site footprint, starting with the largest site located on 12,000 acres outside of Sacramento, California, that contained 2.5 million square feet of facilities. Through a systematic consolidation of capabilities and facilities, as of January 2019, the site had decommissioned a total of 427 buildings, eliminating more than 1,155,000 square feet of manufacturing and office space.

“Through our CIP, Aerojet Rocketdyne has achieved an impressive reorganization – transferring our state-of-the-art capabilities and making the investment needed in equipment and people to stand up operations at new sites that are right-sized and modernized for the future,” said Aerojet Rocketdyne CEO and President Eileen Drake. “With the successful progress of the CIP, we are well on our way to achieving annual cost reductions of approximately $230 million by the year 2021. The culture of our company has undergone a paradigm shift – this is now how we do business. We are laser-focused on consolidating to create efficiencies where we can, and investing in the technologies needed to sustain our profitable growth and innovation in this industry.”

Building on the successful execution of the first phase of its CIP, in April 2017, the company announced an expansion of the affordability drive that further consolidated capabilities and facilities while increasing Aerojet Rocketdyne’s existing presence and manufacturing capabilities in Huntsville, Alabama; Camden, Arkansas; and Orange County, Virginia. At the beginning of July 2018, the company moved into its new office building in Cummings Research Park in Huntsville which housed more than 350 employees at the end of the year. In October 2017, construction began on the company’s new Advanced Manufacturing Facility in Huntsville -- a state-of-the-art factory that will focus on composites and additive manufacturing and is on track to be production-ready by the end of 2019.

(Source: Aerojet Rocketdyne news release)

FMI: www.rocket.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC