Boeing's KC-767 Begins Advanced Boom Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Sep 28, 2006

Boeing's KC-767 Begins Advanced Boom Flight Tests

Features Advanced Emergency Disconnect System

Just as Boeing announcedit was looking at a tanker variant of its 777 to compete for a lucrative USAF tanker contract, Boeing began flight tests on its fifth-generation aerial refueling boom installed on the original KC-767 tanker prototype.

With a control system developed by Smiths Aerospace, the new boom features a fully fly-by-wire control system -- which Smiths says is more responsive, and gives the operator more precise control of the boom.

The flight tests are to demonstrate integration between the new control system and the boom operator. Boeing says the new boom is the same size and shape as the previous systems... but claims the new control system will make it more capable and reliable.

Also on the new boom is a full-time, independent disconnect system -- or IDS. Boom operators onboard the USAF's current KC-135 workhorse rely on a functioning receiver air refueling system to give them the ability to disconnect. Signals from the boom operator through the boom direct the receiver's latching mechanism to release the boom.

However, if the receiver's system malfunctions, the operator -- who is in the best position to see a developing emergency -- might not be able to disconnect immediately using the old system. That problem is addressed with the IDS -- which forces a disconnect independent of the receiver's system.

Boom testing will run for several weeks and is the first in a series of extensive air-refueling tests that will be conducted in upcoming months. As of September 21, the KC-767 Tanker has logged more than 129 flights and about 380 hours.

Both Italy and Japan have purchased the KC-767... both expecting to take delivery in 2007.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC