Third Flight For A400M | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 12, 2010

Third Flight For A400M

Test Crew Concentrated On Flight In Different Aircraft Configurations

Despite earlier reports that EADS Airbus may be considering scrapping the project, the Airbus Military A400M airlifter has flown for the third time as the flight-test program for the type picks up pace after the year-end break.

In a two hour 25 minute sortie from Seville, Spain, on 7th January, the test crew concentrated on exploring flight in different aircraft configurations. The aircraft, known as MSN1, has now completed nine hours and 20 minutes flying.

Test pilot Michel Gagneux became the third pilot to fly the aircraft, supporting Captain Nacho Lombo. Airbus head of flight operations Fernando Alonso also flew on the aircraft for the first time, acting as flight test engineer.

"It was a very satisfying moment to take part in this successful third flight," Alonso said. "We made considerable progress in further exploring the aircraft's behaviour in different configurations and were pleased with what we saw. The flight program is progressing well and in the days ahead, now that the operational flight envelope has been cleared, we will be flying regularly further evaluating the aircraft's handling characteristics and doing initial systems evaluations."

The rhythm of flight testing is expected to increase substantially in the coming days. Overall, this first aircraft is expected to fly for some 1,200 hours during the 3,700hr test program involving five aircraft which will lead to first delivery of the type in late 2012.

FMI: www.airbus.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC