AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Dec 01, 2014

AD: The Boeing Company Airplanes

AD NUMBER: 2014-23-11

PRODUCT: Certain Boeing Model 747-400F series airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2005-13-05, which applied to the airplane listed above.

AD 2005-13-05 required inspections for cracking of the web, upper chord, and upper chord strap of the upper deck floor beams, and repair of any cracking. AD 2005-13-05 also required a preventive modification of the upper deck floor beams, and repetitive inspections for cracking after accomplishing the modification.

This new AD retains these actions and requires a second modification, repetitive inspections for cracking, and repair if necessary. This AD was prompted by a determination that the upper chords of the upper deck floor beams at certain stations are structures that are susceptible to widespread fatigue damage, and that certain airplanes with an initial modification require a second modification for the airplane to meet its limit of validity (LOV).

The FAA is issuing this AD to detect and correct fatigue cracking in certain upper chords of the upper deck floor beam, which could result in reduced structural integrity of the airplane and rapid decompression or reduced controllability of the airplane.

DATES: This AD is effective December 31, 2014.

FMI: AD 

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC