FL Technics Completes Major Aircraft Modifications For A Fifth Airbus A321 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Dec 29, 2017

FL Technics Completes Major Aircraft Modifications For A Fifth Airbus A321

This Lever Of Work Is Usually Performed By The Manufacturer In Its Own Facilities

MRO provider FL Technics has completed a fifth major upgrade project on an Airbus A321 to cap off the year.

“It is very uncommon for aircraft operators to entrust MROs with projects of such scope. They typically prefer to complete them at the manufacturer’s facilities. Therefore, the fact that one of our clients has selected FL Technics to conduct such complex upgrades and modifications on as many as 5 leased Airbus A321s comes to show that our team has developed an exceptionally high reputation and earned major trust amongst prominent market players,” said Zilvinas Lapinskas, CEO of FL Technics.

Lapinskas said that although the project was extremely complex due to an extensive number of technical changes to the aircraft required by the customer, FL Technics engineering, planning and base maintenance teams did a brilliant job and completed the project within the set time frame.  

The latest modification comprised fundamental equipment and furnishing changes in cargo compartment, including the removal of ACT in the AFT cargo hold and the installation of semi-automatic cargo loading system to both cargo compartments. The passenger compartment had to be reconfigured by modifying monuments and adapting seat layout. The newly installed ventilation and heating system in the AFT cargo compartment allows for safe animal transportation.

Another significant part of this project was the installation of wireless ground link quick access recorder designed to provide quick and easy access to raw flight data. Now the Operator no longer needs to physically download data from FDR. Instead, such data will be automatically sent to the Operator’s data-server upon aircraft arrival to the airport.

“From production planning and maintenance management to logistics and real-time technical data coordination with the Airbus – the entire project required not only in-depth technical know-how, but also advanced project management skills. Amongst the greatest challenges was the need to organize all the necessary resources for different project stages in advance.  From the perspective of aircraft modifications, this calls for a completely new level of aircraft maintenance expertise in an MRO organization,” shared Ievgen Oleksandrov, Lead Engineer at Engineering and Planning Department at FL Technics. The last of the five customer’s aircraft was ready in just 28 calendar days.

(Source: FL Technics news release. Image from file)

FMI: www.fltechnics.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC