Urgent AD (CASA): Eurocopter EC-120B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Feb 22, 2010

Urgent AD (CASA): Eurocopter EC-120B

AD No.: 2010-0026-E

ATA 62 Main Rotor Head - Rotor Hub Inspection

Applicability:
Eurocopter helicopter models EC 120 B all serial numbers, if equipped with Main Rotor Head with the following Hub part numbers: C622A1002103, C622A1002104, C622A1002105

Reason:
Eurocopter has been informed that an EC 120 B helicopter has performed an emergency landing due to a set of amplitude vibrations originating from the main rotor.

As a result of the investigation, it was determined that the Main Rotor Head (MRH) hub had failed in the attachment area of one of the three drag damper fittings.

Due to the reasons described above, this Emergency AD requires a repetitive visual inspection for detecting eventual cracks to preclude any risk of MRH hub failure.

Effective Date: 21 February 2010

Required Action(s) and Compliance: Required as indicated, unless already accomplished:

Time(s):

  1. Within the next 15 flight hours after the effective date of this AD and thereafter, at intervals not exceeding 15 flight hours, perform a visual inspection to detect cracks in the inspection areas of the rotor hub in accordance with the instructions of paragraph 2.B.2 of Emergency Alert Service Bulletin Eurocopter EC 120 05A012 - Revision 1 - (EASB).
  2. If no crack is found, re-install the dome fairing if it was removed previously and resume flight in accordance with the instructions of § 2.B.2, of Eurocopter EASB.
  3. If one or more cracks are found, before next flight, contact Eurocopter as described in the NOTE 1 of paragraph 2.A of Eurocopter EASB, and replace the affected rotor hub with a new rotor hub in accordance with § 2.B.2 of Eurocopter EASB.
  4. If during inspection accomplished in accordance with § (1) of this AD local deterioration is found, remove the finish paint until the P05 primer coat become visible and visually inspect the concerned areas in accordance with § 2.B.2.b.3. Accomplish the relevant corrective actions in accordance with § 2.B.2.b.1 or § 2.B.2.b.2.
  5. Replacement of the rotor hub in compliance with § (3) or § (4) of this AD does not terminate the repetitive inspection requirements of § (1) of this AD.

Ref. Publications:
Eurocopter EC 120 B EASB 05A012 – Revision 1, dated 19 February 2010.
The use of later approved revisions of this document is acceptable for compliance with the requirements of this AD.

Remarks:

  1. If requested and appropriately substantiated, EASA can approve Alternative Methods of Compliance for this AD.
  2. The safety assessment has requested not to implement the full consultation process and an immediate publication and notification.
  3. Enquiries regarding this AD should be referred to the Airworthiness Directives, Safety Management & Research Section, Certification Directorate, EASA; E-mail: ADs@easa.europa.eu .
  4. For any question concerning the technical content of the requirements in this AD, please contact:
    EUROCOPTER (STDI), Aéroport de Marseille Provence,
    13725 Marignane Cedex, France
    Telephone: +33 (0) 4 42 85 97 97 - Fax +33 (0) 4 42 85 99 66
    E-mail:Directive.technical-support@eurocopter.com:
FMI: www.casa.gov.au/wcmswr/_assets/main/airworth/airwd/adfiles/rotor/ec120/2010-0026-e.pdf

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC