Factory Leasing Program Announced For Great Lakes By WACO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Dec 03, 2014

Factory Leasing Program Announced For Great Lakes By WACO

Designed To Support Upset Prevention And Recovery Training Flight Schools

WACO Aircraft Corp. has rolled out a new Factory Direct leasing program for the Great Lakes 2T-1A-2. The company says the program is designed to support the Upset Prevention and Recovery Training needs for Flight Schools and help them comply with FAA AC 120-UPRT, FAA AC 120-109 and upcoming ICAO 10011 “Airplane Upset Prevention and Recovery Training” manual guidelines.

This simple lease plan is comprised of a low monthly base lease rate that includes flight hours, then an hourly rate for time over the included base. The program includes all scheduled maintenance. The program can be custom tailored for the unique needs of each school and features a streamlined approval process.
 
The new Great Lakes by WACO is a fully aerobatic, 180 horsepower aircraft featuring docile ground handling yet excellent aerobatic capability. The company says those characteristics make it "the perfect trainer for Loss of Control In-Flight (LOC-I) programs."
 
Integrating Upset Prevention and Recovery Training into your flight curriculum is an upcoming requirement for all part 141 schools.
 
The lease includes:

  • All Scheduled Maintenance including parts
  • Oil Changes (every 50 hours)
  • 100 Hour Inspections
  • Annual Inspections
  • Pitot and Static certification
  • Squawks affecting the airworthiness of the airplane
  • Engine Replacement at TBO (1600 hours)
  • Complete aircraft overhaul at the factory every 3200 hours

The airplane has been certified by both FAA and EASA for transition training for instructors needing minimal checkout time.

(Image provided by WACO Aircraft)

FMI: www.wacoaircraft.com

 


Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC