Diamond D-JET Coming To EAA AirVenture 2012 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 26, 2012

Diamond D-JET Coming To EAA AirVenture 2012

On Hand For 'Jet Day' On Thursday

Diamond will be flying D-JET prototype 003 to Oshkosh on Thursday July 26th for the “Jet-Day” static display at Phillips 66 Plaza. “The D-JET program has continued to make steady progress through the industry wide turbulence of the past several years,” said Peter Maurer, President and CEO of Diamond's Canadian operations. “We are nearing 700 hrs of D-JET development flight test time and are very pleased with the results.

The company says its recent flights have focused on verifying compliance with the FAR 23 Flight requirements, specifically handling, stability and control throughout the weight and balance envelope, tests of stall speeds and stall characteristics at various weight and balance points and with different system configurations, basic system testing, expansion of the speed envelope to Mmo of 0.56 (= 346 ktas), and much detail development work, such as fine tuning the control forces and determination of the stick pusher activation point.

"At this point the aerodynamic configuration is frozen and visitors to Oshkosh will see one specific detail change that not only has a positive effect on the stall speed and roll control, but also the overall aesthetics,” Maurer said.

“Our work in the air is only part of the story. In parallel to continued flight tests we have successfully completed significant ground tests, including limit load pressure tests and over 30,000 maximum cabin pressure cycles on a full scale test article fuselage, testing of the engine bleed air and cabin pressurization system, structural testing, landing gear tests and composite material qualification testing," Maurer continued. "We are now focusing on the production of tooling for S/N 004 and subsequent. Once 004 is flying, it will take approximately another year to achieve Type Certification with initial deliveries scheduled in the fall of 2014. We look forward to the day that we start deliveries of the D-JET and are most grateful for the patience and loyalty demonstrated by our customers, our business partners, and our employees.”

Diamond's piston airplane models, including the new jet-fuel Austro Engine powered DA42, are on display at the Diamond display.

FMI: www.diamondaircraft.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC