2nd Ariane 5 To Be Launched This Year Enters Assembly Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 11, 2010

2nd Ariane 5 To Be Launched This Year Enters Assembly Process

Ariane Plans A Total Of Seven Mission In 2010

The Ariane 5 for Arianespace's second dual-payload flight of 2010 has begun its assembly as the Spaceport in French Guiana is once again the center of activity for two parallel missions.

This latest Ariane 5 began taking shape earlier in the week as its cryogenic core stage was positioned over a mobile launch table in the Spaceport's Launcher Integration Building. It was then joined by the vehicle's two solid boosters for mating.

The second mission of 2010 will utilize a heavy-lift Ariane 5 ECA version of Arianespace's workhorse launcher, and will carry two telecommunications satellites.

As the launch campaign begins for this flight, another Ariane 5 ECA is in the Spaceport's Final Assembly Building, where it is awaiting the integration of its two satellite passengers: ASTRA 3B & COMSATBw-2. The liftoff of this year-opening Arianespace launch is set for March 24.

Arianespace is targeting a total of seven Ariane 5 missions during 2010 while preparations also continue for the upcoming introductions of the medium-lift Soyuz and lightweight Vega launcher in side-by-side operations at the Spaceport.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC