Navy EA-6B Fighting Fatigue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 05, 2003

Navy EA-6B Fighting Fatigue

19 Down (Temporarily), 24 To Go

Naval Air Systems Command (NAVAIR) removed 19 EA-6B "Prowlers" from service Sept. 23, for repairs and maintenance due to structural fatigue damage, with 24 additional aircraft to follow within two months.

The reduction in active aircraft inventory is the result of recently completed engineering evaluations of structural health and reduced risk-to-tolerance commensurate with world events. The Navy continues to optimize available EA-6B resources to best support current operational and training requirements, while keeping crew-safety the top priority.

The number of Prowlers will be reduced from 95 to 71 until spring, primarily to induct high fatigue aircraft with Wing Center Sections and Outer Wing Panels issues into depot maintenance for wing replacement.

Currently, the EA-6B is the most capable and only tactical electronic attack aircraft in DoD inventory. The Navy has worked very closely with other services to balance joint and naval operational requirements against available EA-6B aircraft. According to NAVAIR officials, the road ahead involves the carefully designed disestablishment of one of the Navy's four expeditionary squadrons, which dually provides an opportunity to achieve force reductions, while still fulfilling all joint and naval requirements.

The new breakdown of squadrons would include Navy Carrier Squadrons (30 aircraft), Navy Expeditionary Squadrons (9 aircraft), Marine Expeditionary Squadrons (15), Fleet Replacement (13), Navy Reserve (2) and Testing (2 aircraft). All of these initiatives are to help sustain the EA-6B fleet until the introduction of the highly anticipated EA-18G beginning 2009.

The EA-6B could return to pre-Operation Iraqi Freedom numbers in approximately 24 months. The Navy remains committed to providing electronic warfare capability to combatant commanders to support ongoing real-world requirements. [ANN Thanks Journalist 2nd Class Kimberly Rodgers, Navy News Service, for the report]

FMI: www.navy.mil. www.navair.mil

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC