Mars Odyssey Team To Check Status Of Backup System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Mar 07, 2009

Mars Odyssey Team To Check Status Of Backup System

Will Conduct Reboot Operation Next Week

The team operating NASA's Mars Odyssey orbiter plans a complicated reboot operation of the spacecraft's computer next week, to address a long-known, potential vulnerability of accumulated memory corruption.

"This is not a risk-free event," the agency notes, "but the Odyssey team and NASA have carefully weighed the risks of performing a cold reboot compared with the risk of doing nothing, and determined that the proper course of action is to proceed with the reboot."

The chief concern about the potential memory vulnerability stems from the length of time the spacecraft has been exposed to the accumulated effects of the space radiation environment since the last reboot, which occurred on October 31, 2003. As an additional benefit, the cold-reboot procedure will demonstrate whether Odyssey's onboard backup systems will be available should they ever be required.

"We have lost no functionality, but there would be advantages to knowing whether the B side is available," said Odyssey Mission Manager Gaylon McSmith of NASA's Jet Propulsion Laboratory, Pasadena, CA. "We have developed a careful plan for attempting to determine that."

In the years since its April 7, 2001, launch, Odyssey has not needed to use its set of spare components. The spares are called the spacecraft's "B side," which includes an identical set of a computer processor, navigation sensors, relay radio and other subsystems. To use any of them, Odyssey would have to shift to all of them at once from its primary set of components, called the "A side."

On March 21, 2007, the B-side spare of an electronic component for managing the distribution of power, called the high-efficiency power supply, became inoperable. If it is permanently disabled, then none of the B side is available for use. Engineers have investigated the inoperability of the B-side high-efficiency power supply. They concluded that the component can probably be made to work properly again by rebooting the orbiter's computer, although the memory-vulnerability issue that is the current concern is not directly related to the March 2007 event that affected the power supply.

Odyssey is in the third two-year extension of its mission at Mars. Some A-side components, such as the UHF radio used for communications with spacecraft on the surface of Mars, have worked as long as they were designed to last.

In addition to its own major scientific discoveries and continuing studies of the planet, the Odyssey mission has played important roles in supporting the missions of the Mars rovers Spirit and Opportunity and the Phoenix Mars Lander.

FMI: www.nasa.gov/mission_pages/odyssey

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC