NASA Calls For Comments On Draft Altair RFP | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Dec 19, 2008

NASA Calls For Comments On Draft Altair RFP

Bidding Will Soon Open For NextGen Lunar Lander

NASA has released a draft request for proposals, or RFP, to seek industry support for the design of its Altair lunar lander vehicle, part of NASA's Constellation Program. Altair is proposed to deliver four astronauts to the moon's surface late in the next decade.

The Altair Conceptual Design Contract will define operational concepts, support requirements reviews, and refine design concepts for the Altair vehicle. This document is a draft of the final version of the RFP, expected in late January 2009.

"By responding to this draft RFP, potential offerors can provide input about possible requirements, small business goals and contract structure," NASA states. "The industry input received will be combined with NASA's expertise for potential inclusion in the final RFP."

A pre-solicitation conference is scheduled for December 18 at NASA's Johnson Space Center in Houston. The conference is designed for information sharing about the Altair conceptual design contract with potential offerors.

FMI: http://procurement.jsc.nasa.gov/altair, www.nasa.gov/constellation

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC