200th Ariane Launcher Takes Shape At French Guiana Spaceport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Dec 14, 2010

200th Ariane Launcher Takes Shape At French Guiana Spaceport

Preparations Underway For February 2011 Mission With Europe's 2nd ATV

Assembly of the milestone 200th Ariane is now underway at the Spaceport in French Guiana in preparation for its February 2011 mission with Europe's second Automated Transfer Vehicle (ATV), which will service the International Space Station.


Ariane 5 Booster Assembly

This Ariane 5 ES version of Arianespace's workhorse heavy-lift launcher is being assembled in the Spaceport's Launcher Integration Building, where activity began mid-week with the core cryogenic stage's positioning over the mobile launch table. It was followed by rollout of Ariane 5's two large solid rocket boosters for mating with the core stage.

Ariane 5 is the latest version of Europe's Ariane launcher family, which began operations in 1979 and has orbited a full range of payloads that include telecommunications satellites, Earth observation and meteorology platforms, space exploration probes, along with defense and security spacecraft. Arianespace operates two standardized versions of Ariane 5: the ES version for flights to low- and medium-Earth orbits; and the Ariane 5 ECA for GTO (geostationary transfer orbit) missions.


Ariane 5 Cryogenic Core Delivery

The ATV for next February's flight is named after German astronomer/mathematician Johannes Kepler, and will be the second such unmanned logistics spacecraft launched by Ariane 5. These ATVs are part of Europe's contribution to the International Space Station's operation and maintenance.

FMI: www.arianespace.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC