Running Hot And Cold On The Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Apr 24, 2010

Running Hot And Cold On The Dreamliner

787 Undergoing Extreme-Weather Testing In Florida

The 787 Dreamliner has begun a series of extreme-weather tests at Valparaiso, FL. A special hangar at the McKinley Climatic Laboratory at Elgin Air Force Base allows the airplane to experience heat as high as 115 degrees Fahrenheit and as low as minus 45 degrees Fahrenheit.

After the airplane is stabilized at either the hot or cold temperatures, flight test technicians will follow the Airplane Maintenance Manual to perform the steps required to prepare the airplane for flight release and operate under these conditions. Sensors and monitors will allow the test team to determine if all systems hardware and software operate as expected.

Cold-weather testing is being conducted first, with preliminary hot-weather testing to follow. Additional extreme-weather testing will be conducted later in the flight test program.

"We have Dreamliner customers who will operate the 787 in a wide variety of environments throughout the world," said Scott Fancher, vice president and general manager of the 787 program for Boeing Commercial Airplanes. "This testing is about ensuring that the airplane meets the expectations of our customers."

A crew of approximately 100 people traveled from Seattle to support the test operations on ZA003, the third 787 airplane to be built.

The McKinley Climatic Laboratory is the second remote testing location for the 787 Dreamliner. The second airplane in the fleet, ZA002, performed a variety of tests in Victorville, CA, last month. The testing in Florida is expected to last nearly two weeks.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC