Ariane 5 On Track For Next Month's Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Sep 25, 2016

Ariane 5 On Track For Next Month's Mission

Pace Of Pre-Flight Activities Increasing At Spaceport In French Guiana

Pre-flight activities for Arianespace’s upcoming Ariane 5 mission are ramping up at the Spaceport in French Guiana, with launcher and payload preparations advancing in parallel for the October 4 liftoff.

In a major milestone reached this month, Ariane 5 was rolled out from the Spaceport’s Launcher Integration Building – where its core cryogenic stage, two solid boosters and cryogenic upper stage were mated – to the Final Assembly Building. This process formally transferred authority for the heavy-lift vehicle to Arianespace from production prime contractor Airbus Safran Launchers.

With Ariane 5 now under Arianespace’s responsibility, the launcher is in position to receive its two passengers: the Sky Muster II and GSAT-18 telecommunications satellites, both of which were fueled earlier this month inside the Spaceport’s S5 payload preparation facility.

The October 4 mission with Ariane 5 is designated Flight VA231 in Arianespace’s numbering system, and it will deliver the two spacecraft to geostationary transfer orbit.

There will be two payloads on board for the launch. Built by SSL (Space Systems Loral) for the Australian national broadband network (nbn), Sky Muster II will utilize advanced-design multiple spot beams to help bridge the digital divide for some 400,000 homes and businesses in regional and remote areas of the country.

Sky Muster II is one of the world’s largest communications platforms with a liftoff mass estimated at 6,400 kg. Its launch follows the orbiting of nbn’s first Sky Muster satellite on an Arianespace Ariane 5 mission performed in September 2015.

Flight VA231’s second passenger – GSAT-18 – is a telecommunications spacecraft developed by the Indian Space Research Organisation (ISRO). Once in orbit, it will serve as a replacement for operational satellites that currently provide key national services in multiple frequency bands – to be joined by GSAT-17, which will be orbited on a future Ariane 5 mission from the Spaceport in French Guiana.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC